CHARGING SOLUTIONS 01 / MANAGED AC

Commercial AC charging for workplaces and destinations

Build a managed AC charging brief for workplaces, hotels and shared parking, covering access, energy allocation, operations and product selection.

On this page 4 sections

Commercial AC charging combines a wallbox with an operating policy: who may charge, how the site’s available power is shared and how sessions are recorded. Start with vehicle dwell time and the site supply, then define the access and management functions the selected configuration must provide.

Match the operating pattern

SiteQuestions for the project briefA configuration to evaluate
WorkplaceAre bays assigned or shared? Must vehicles be ready by shift end?Managed AC with staff authorization and site power limits
Hotel or destinationHow long do guests stay? Who handles access and support?AC charging with a clear guest-access process
Shared residential parkingHow are users identified and energy records assigned?Access control, metering records and a documented allocation policy

These are planning scenarios, not completed Ampvoya installations or guaranteed savings.

Keep the system responsibilities clear

Site supplyCapacity and protection
Meter & controlAgreed site limits
AC wallboxesVehicles and access
ManagementSessions and support

The charger, site controller and backend may come from different parties. Agree who supplies each item, who commissions the whole system and who supports it after handover.

Product and software selection

No commercial AC models are currently listed. The next range will be reviewed against OEM terms, exact connector and power combinations, metering, firmware and backend acceptance before publication.

Use the OCPP integration guide to agree operational tests and the load-management brief to define how charging responds to building demand.

Information to send with your enquiry

  1. Country, site type and intended public or restricted access.
  2. Initial bay count, future expansion and likely simultaneous use.
  3. Available supply and a measured demand profile, if available.
  4. Vehicle mix, parking duration and required energy.
  5. Access method, metering, billing and target backend.
  6. The installer, operator and required acceptance documents.

Equipment requirements and local installation rules are separate reviews. See the market documentation checklist before finalizing the sample configuration.

MAKE THE REQUIREMENTS CONCRETE

Build a brief for this project.

Share the destination, vehicle requirements, number of charging bays and available site power.

Prepare a project enquiry ↗Explore all solutions ↗